Skip to content

Incident Management, SLOs and Postmortems

v2026

An SLO is a promise about user experience that you can measure; the error budget is the unreliability that promise still allows, and spending it is permission to ship fast until the promise is at risk. An incident is the moment the budget burns faster than planned, and it is run by roles, not by whoever is loudest. A postmortem then fixes the system that let a reasonable person make the mistake — never the person.

TermIsExample
SLIA measured ratio of good eventsNon-5xx checkouts / all
SLOA target for an SLI over a window99.9% over 30 days
SLAA contract with consequencesCredits below 99.5%

Measure an SLI as good events divided by valid events, as close to the user as you can — the load balancer, not a host metric. Google’s quick test for SLO versus SLA: ask what happens when it is missed. If nothing explicit happens, it is an SLO. Keep the SLO stricter than any SLA so you get warned before you owe anyone money.

SLI = good requests / valid requests
SLO = SLI >= 99.9% over rolling 30 days
SLA = refund if monthly SLI < 99.5%
SLOBudgetPer 30 days
99%1%7 h 12 min
99.5%0.5%3 h 36 min
99.9%0.1%43.2 min
99.95%0.05%21.6 min
99.99%0.01%4.32 min

The budget is simply 1 − SLO. For request-based SLIs, count events, not minutes: at 99.9%, three million requests in a window allow 3,000 failures. Agree up front, in writing, what happens when the budget runs out — otherwise the policy gets negotiated during the outage.

Error budget policy (example)
Budget left -> ship normally
Budget exhausted -> freeze risky releases;
next sprint: reliability
One incident used
> 20% of budget -> mandatory postmortem

Gotcha: 100% is the wrong target. Past a point users cannot notice the difference through their own networks and devices, and a zero budget forbids every release. Pick the lowest target users would still be happy with.

Burn rateLong / short windowBudget spent → action
14.4×1 h / 5 min2% → page
6×6 h / 30 min5% → page
1×3 d / 6 h10% → ticket

Burn rate is how fast you spend the budget: at 1× it lasts exactly the SLO window. The SRE Workbook pairs each long window with a short one, firing only when both breach, so the alert stops minutes after the errors do. Page on symptoms users feel (error ratio, latency), not causes (CPU, disk) — causes go to dashboards and tickets.

SLO 99.9%, 30-day window = 720 h
Page if error ratio > 14.4 x 0.001 = 1.44%
over the last 1 h AND the last 5 min
14.4 x 1 h / 720 h = 2% of budget gone

Tip: Anything that wakes a human at night must be immediately actionable by that human. If the right response is “look at it tomorrow”, route it to business hours or a ticket.

LevelMeansResponse
SEV-1Critical, many users, publicAll hands, IC, status page
SEV-2Major feature broken for manyIC, incident channel
SEV-3Partial or at-risk, few usersOwning team, top priority
SEV-4Minor, no user impactTicket

Lower numbers are more urgent. Define each level by user impact in your own words before you need it, and treat SEV-2 and above as major incidents with the full role structure. PagerDuty’s public scale runs SEV-1 to SEV-5; four levels are enough for most product teams.

Declare when ANY is true:
- an SLO page fired
- customers report it
- you need help from another team
Unsure between two levels? Pick the higher.

Gotcha: Teams lose the most valuable minutes debating whether it is “really” an incident. Declaring is cheap and downgrading is free; argue about severity in the postmortem, not on the call.

RoleOwns
Incident Commander (IC)Decisions, roles, status; does not fix
Ops lead / SMEsThe only people changing production
Comms leadStakeholder and status-page updates
ScribeTimeline and decisions log

The IC is the single source of truth and delegates every repair action. On a small team one person may hold several roles, but the IC should never also be debugging. Hand command over explicitly, and the outgoing IC stays until the new one acknowledges. PagerDuty posts a first public notice within 5 minutes and updates at least every 20 minutes for the first two hours.

[Investigating] Checkout errors - 14:05 UTC
Impact: ~30% of card payments fail in EU.
Doing: rolled back release 412; watching.
Workaround: PayPal is unaffected.
Next update: 14:25 UTC or sooner.

Tip: Always state when the next update will come. Silence during an incident reads as “nobody is working on it”.

SectionAnswers
Summary and impactWhat happened, to whom, how long
TimelineDetection, key actions, recovery
Contributing factorsWhy the system allowed it
What went well / badlyResponse, not people
Action itemsOwner, ticket, priority

Write one for every major incident while memory is fresh — PagerDuty schedules the review within 3 calendar days for a SEV-1 and 5 business days for a SEV-2. Assume everyone acted reasonably on what they knew; the useful question is why the system made the wrong action easy and the failure hard to see.

Not: "Alex ran the wrong migration."
Yes: "The migration ran against prod because
the CLI defaults to the prod profile and
nothing asks for confirmation."

Warning: “Human error” as a root cause ends the investigation exactly where it should start. It also teaches people to hide mistakes, which removes your best early-warning signal.

PracticeWhy
Few action items, each with owner and ticketUnowned items never ship
Track them like product workPostmortems without follow-up repeat
Primary plus backup on-callNobody is a single point of failure
Handover notes at shift endOpen issues survive the rotation
New members shadow firstLearn before carrying the pager

Prefer action items that remove a class of failure (a guardrail, a test, an alert on the right symptom) over “be more careful”. Review paging volume regularly: alerts that fire and need no action should be fixed or deleted, because alert fatigue is how real pages get missed.

AI-1 Add confirm prompt for prod profile
owner: @dana ticket: OPS-311 P1
AI-2 Alert on checkout error ratio by region
owner: @lee ticket: OPS-312 P1